LSAW pipe
Prime Mill Grade | Certified China Exporter & Factory Direct Supply

LSAW pipe - Technical Overview & Specifications
The longitudinal submerged arc welded pipe is made of steel plate as raw material, which is formed by a forming machine, and then double-sided submerged arc welding is carried out. Through this process, the LSAW pipe will have excellent ductility, toughness, uniformity, plasticity and good sealing performance. The production equipment can be produced quickly, easy to replace, and the product specification range of LSAW pipe is large. The production line can produce welded pipe diameter 406-4500mm, wall thickness 8mm-100mm.
Product Parameters
| Product Name | LSAW pipe |
| Standard | EN / DIN / JIS / ASTM / BS / ASME / AISI etc. |
| Outer Diameter | 406mm - 4500mm |
| Wall Thickness | 8-100mm |
| Length | 5.8 meters-12.5 meters, Support customization |
| Manufacturing Type | Longitudinal submerged arc welded pipe and welded steel pipe |
International Standard Grade Comparison
| USA | Japan | Germany | U.K. | France | Italy | Spain | Switzerland | China | ||
|---|---|---|---|---|---|---|---|---|---|---|
| AISI/SAE | JIS | W‐nr. | DIN | BS | EN | AFNOR | UNI | UNE | SS | GB |
| A570.36 | STKM 12A | 1.0038 | RSt.37‐2 | 4360 | ‐ | E 24‐2 | ‐ | ‐ | 1311 | 15 |
| - | STKM 12C | - | - | 40 C | - | Ne | - | - | - | - |
| 1015 | ‐ | 1.0401 | C15 | 080M15 | ‐ | CC12 | C15, C16 | F.111 | 1350 | 15 |
| 1020 | ‐ | 1.0402 | C22 | 050A20 | 2C | CC20 | C20, C21 | F.112 | 1450 | 20 |
| 1213 | SUM22 | 1.0715 | 9SMn28 | 230M07 | 1A | S250 | CF9SMn28 | F.2111 | 1912 | Y15 |
| 11SMn28 | ||||||||||
| 12L13 | SUM22L | 1.0718 | 9SMnPb28 | ‐ | ‐ | S250Pb | CF9SMnPb28 | 11SMnPb28 | 1914 | ‐ |
| ‐ | ‐ | 1.0722 | 10SPb20 | ‐ | ‐ | 10PbF2 | CF10Pb20 | 10SPb20 | ‐ | ‐ |
| 1215 | ‐ | 1.0736 | 9SMn36 | 240M07 | 1B | S300 | CF9SMn36 | 12SMn35 | ‐ | Y13 |
| 12L14 | ‐ | 1.0737 | 9SMnPb36 | ‐ | ‐ | S300PB | CF9SMnPb36 | 12SMnP35 | 1926 | ‐ |
| 1015 | S15C | 1.1141 | Ck15 | 080M15 | 32C | XC12 | C16 | C15K | 1370 | 15 |
| 1025 | S25C | 1.1158 | Ck25 | ‐ | ‐ | ‐ | ‐ | ‐ | ‐ | 25 |
| A572 - 60 | ‐ | 1.890 | StE380 | 4360 55 | ‐ | ‐ | FeE390KG | ‐ | 2145 | ‐ |
| 1035 | ‐ | 1.0501 | C35 | 060A35 | ‐ | CC35 | C35 | F.113 | 1550 | 35 |
| 1045 | ‐ | 1.0503 | C45 | 080M46 | ‐ | CC45 | C45 | F.114 | 1650 | 45 |
| 1140 | ‐ | 1.0726 | 35S20 | 212M36 | 8M | 35MF4 | ‐ | F210G | 1957 | ‐ |
| 1039 | ‐ | 1.1157 | 40Mn4 | 150M36 | 15 | 35M5 | ‐ | ‐ | ‐ | 40Mn |
| 1335 | SMn438(H) | 1.1167 | 36Mn5 | ‐ | ‐ | 40M5 | ‐ | 36Mn5 | 2120 | 35Mn2 |
| 1330 | SCMn1 | 1.1170 | 28Mn6 | 150M28 | 14A | 20M5 | C28Mn | ‐ | ‐ | 30Mn |
| 1035 | S35C | 1.1183 | Cf35 | 060A35 | ‐ | XC38TS | C36 | ‐ | 1572 | 35Mn |
| 1045 | S45C | 1.1191 | Ck45 | 080M46 | ‐ | XC42 | C45 | C45K | 1672 | Ck45 |
| 1050 | S50C | 1.1213 | Cf53 | 060A52 | ‐ | XC48TS | C53 | ‐ | 1674 | 50 |
| 1055 | ‐ | 1.0535 | C55 | 070M55 | 9 | ‐ | C55 | ‐ | 1655 | 55 |
| 1060 | ‐ | 1.0601 | C60 | 080A62 | 43D | CC55 | C60 | ‐ | ‐ | 60 |
| 1055 | S55C | 1.1203 | Ck55 | 070M55 | ‐ | XC55 | C50 | C55K | ‐ | 55 |
| 1060 | S58C | 1.1221 | Ck60 | 080A62 | 43D | XC60 | C60 | ‐ | 1678 | 60Mn |
| 1095 | ‐ | 1.1274 | Ck101 | 060A96 | ‐ | XC100 | ‐ | F.5117 | 1870 | ‐ |
| W1 | SK3 | 1.1545 | C105W1 | BW1A | ‐ | Y105 | C36KU | F.5118 | 1880 | ‐ |
| W210 | SUP4 | 1.1545 | C105W1 | BW2 | ‐ | Y120 | C120KU | F.515 | 2900 | ‐ |
Product Features & Advantages
- Manufactured to EN / DIN / JIS / ASTM / BS / ASME / AISI etc. with strict dimensional tolerance and surface quality
- Reliable Carbon Steel Pipe solution for construction, machinery and industrial projects
- Custom processing available: cutting, bending, decoiling, slitting and surface polishing
- Mill Test Certificate (MTC) and full inspection provided
Applications & Industries
Customer Reviews & Mill Quality Audits
Overall Satisfaction from Global EPC & Steel Buyers
EN 10204 3.1 Chemical & Tensile Verification Passed
SGS, BV & Cotecna Third-Party Audits Supported
SEND INQUIRY FOR LSAW pipe
Please leave your specific requirements (size, grade, quantity, destination port). Our sales engineer will reply within 2 hours.
Related Steel Pipe
View All >DIRECT MILL INQUIRY

FACTORY WORKSHOP

Factory Workshop 1

Factory Workshop 2

Factory Workshop 3

Factory Workshop 4
CUSTOMER VISIT

Customer visit

Customer visit

Customer visit
CERTIFICATE OF HONOR



COOPERATIVE PARTNER















